
Most house or flat shapes can be managed by adding more modules and roof styles, either monopitch or traditional depending on the clients requirements, location etc.
The construction is of galvanised steel frame with SIP panel inserts. The interior finish is two layers of plaster board decorated in emulsion paint. Wallpapering can be incorporated but would add slightly to the cost.
The basic units comply with Code Level 3 or Code Level 4 if required.
The construction is of galvanised steel frame with SIP panel inserts. The interior finish is two layers of plaster board decorated in emulsion paint. Wallpapering can be incorporated but would add slightly to the cost.
The basic units comply with Code Level 3 or Code Level 4 if required.



